AExcellentSan Tan Valley, AZ
ASP - America's Swimming Pool Company of Queen Creek
- Pool service
- Pump repair
- Pool repair
- +3 more
- 4.8 · 225
- In business
- 21 yrs
- ROC no.
- Listed
Service · Phoenix metro
Full or partial remodels of existing pools, including new finishes, tile, coping, water features, and equipment upgrades.
112 listed Valley companies say they do this.
Remodel the Pool You Already Own
Your pool has good bones and tired surfaces. A remodel updates the finish, tile, coping and equipment without starting from scratch, but the wrong license class can undermine the job.
01
A remodel is a planned upgrade of an existing pool: new finish, tile, coping, water features or equipment, done all at once or in phases. A repair fixes one failing part. Refinishing, meaning new plaster or pebble, can be one piece of a remodel.

Licensing separates these jobs. The R-6 class covers servicing and minor repair, and complete replacement of plaster or pebble interiors and decks falls outside it.
The B-5 class covers construction and repair of pools and spas.[1]
Sound familiar? Your Mesa or Chandler pool looks dated. You patched a few tiles and scrubbed the stains. Now the finish is rougher and the list of fixes keeps growing.
Waiting rarely shrinks the scope. Worn surfaces and failing equipment tend to pile up into a bigger project.
02
Scope sets the price: partial or full, finish type, tile and coping, water features and equipment. The figures below come from Phoenix-area pool companies' own websites, checked October 2026. Each line is one company's general guidance, not a quote for your pool.
| Project size | Price printed on company sites |
|---|---|
| Small single-component project | As little as $4,000 (entry price) |
| Small projects | $4,000 (entry price) |
| Pool remodeling and renovation | $5,000 to $15,000 |
| Extensive renovations | $100,000 |
One Phoenix company's site says remodeling and renovation typically runs $5,000 to $15,000. The $4,000 figures are entry prices, not typical totals.
Price at a glance
Typical pool remodel and renovation
$5,000 to $15,000
Extensive renovations sit at the far end of the range.
Pump, heater, electrical or gas work added to a remodel depends on the job. Ask for an itemized written quote.
Price factors
What moves the price
Scope
Partial remodels cost less than full ones
Finish type
The surface you choose changes the total
Tile and coping
Edge and waterline work adds to the bill
Water features
Added features raise the price
Equipment
Pump, heater, electrical or gas work depends on the job
Compare the budget with building new in Pool remodel cost in Phoenix. For finish options, see plaster vs. pebble.
03
A pool remodel runs in seven steps, from the first consultation to refill and startup.
Step by step
The seven steps of a pool remodel
Consultation and scope
Decide what changes, what stays and what can wait.
Written bid
Get the contract in writing with the contractor's details.
Permits, if needed
The contract should name who pulls them.
Drain and demolition
The pool is drained and old material comes out.
Tile, coping and finish work
The new surfaces and edges go in.
Equipment installation
New equipment is set up and connected.
Refill and startup
The pool is filled and the system is started.
Adding a baja shelf, raised bond beam, spa spillway or waterfall near a property line can trigger review. A survey waiver applies when the water's edge or a feature sits under 5 feet from the property line. Zoning sets a 3-foot minimum setback.
A like-for-like resurface is a different case. The Phoenix pool remodel permit guide covers the details.
A remodel that changes the deck or layout should also be checked against the Arizona barrier rules.
Duration depends on scope, permit review and the contractor's calendar.
Get a written start and completion estimate in the contract, which Arizona law requires for contracts over $1,000.

04
| Class | Covers | Watch-out |
|---|---|---|
| R-6 / CR-6 | Service and minor repair | Excludes complete replacement of plaster or pebble interiors and decks |
| B-5 / B-6 | Construction and repair of pools and spas | Confirm the scope on the ROC record |
| KA-5 / KA-6 | Dual classifications | Confirm which work each covers |
R-6 also excludes certain plumbing, gas and electrical work, which matters if your remodel adds a gas heater or new wiring.[1] Our guide to R-6, B-5 or KA-5 goes further.
"Licensed, bonded and insured" in an ad proves little. Ask for a workers' compensation certificate and a separate liability certificate. See what the phrase means in Arizona.
Checklist
Questions to ask a contractor
0 of 7 ticked
Tick them off as you go. Nothing is saved or sent.
Hiring an unlicensed entity leaves you without ROC recourse.
Avoid cash and avoid payments that run ahead of finished work.
Compare Scottsdale, Gilbert and Tempe contractors against this checklist, using our questions to ask.
Neither is universally better; the right choice depends on the pool's condition and your budget. Replastering (a standard plaster refresh) is the most common and cost-effective option when the existing surface is sound, while resurfacing with pebble or quartz finishes costs more but offers greater durability, a smoother feel, and more design choices. In the Phoenix area, where intense sun and hard water shorten plaster life, many owners choose a pebble or quartz upgrade when they are already paying for a refinish.
A licensed pool contractor can inspect the shell for cracks, delamination, or hollow spots before recommending either option.
AExcellentSan Tan Valley, AZ
AExcellent
AExcellent